Construction Updates

07/20/20  The first units are being finished this month.  They are looking clean and welcoming!

06/22/20  Trim, door, and cabinet installation is ongoing.  These stunning flats are taking shape and will be move in ready soon!

06/16/20  Building Exteriors are nearing completion including unique, beautiful artwork displayed on each building.

05/07/20 These homes are really starting to come together!  Siding will be completed soon so check out the contact page to request more information.

05/01/20 Insulation and soundproofing are completed on the first building.  Sheetrock and finishes coming soon!

03/25/20 Protective ZipSystems are up and trusses have been secured on the first buildings.  The large window openings are being filled as Gerkin Windows are installed for superior wind resistance and thermal insulation.

02/05/20 Construction is underway and foundations have been completed for all three buildings of the first phase!  Framing will begin soon. 

01/05/20 CP Build is coordinating with contractors and is scheduled to break ground early this month beginning the excavation and foundations of three 12-plex units.  

12/10/20 CP Haus, our residential design branch, has been hard at work partnering with CP Build to plan out every detail of the structural and exterior design.  They are balancing the structural needs while zeroing in on floor plans that best use space for future residents.  Both two and three-bedroom floor plans are being solidified.